- Compressor plant
- Korean fabric plant
- High-speed rail station
Compressor plant
The trip opened at the Compra factory at El Araby Group’s commercial complex in the governorate.
Abdelrahman Salah El Araby, Compra’s handling director, stated the plant would be integrated in 2 stages. The very first, on 15,000 square metres, has capability of 1.5 million compressors a year and uses about 300 individuals, with 35% of output utilizing energy-saving inverter innovation and 20% allocated for export. The 2nd stage will broaden the website to 25,000 square metres and lift capability to 4.5 million systems a year, with about 500 tasks, 65% of output in inverter designs and 38% for export.
The factory produces rotary compressors utilizing R32 and R290, refrigerant gases with a lower ecological effect.
Feng Ming-fa, Rechi’s president and handling director, stated the very first stage brings assembly innovation to Egypt, while the second will include innovation for making the main elements. He stated he hoped the plant might start exporting compressors from Egypt within 3 years.
Mohamed El Araby, president of El Araby Group, stated the group intended to develop a base for parts and inputs along with ended up home appliances, to raise regional material. Market Minister Khaled Hashem stated the job would lower dependence on imports of a crucial device element.
Korean fabric plant
Madbouly likewise checked out the South Korean-owned fabric factory Lee Hwa Egypt in the Kom Abu Radi commercial zone in Al-Wasta, which produces raw, colored and ended up polyester materials. The plant, which began running in 2020 on about 40,000 square metres, represents Korean financial investment of $150m and utilizes about 455 individuals. It has capability of about 13,000 direct metres of material and 6,291 tonnes of undyed artificial fiber material, and exports a few of its output to the UAE.
The prime minister then examined the Fayoum/Beni Suef station on the high-speed electrical train network, accompanied by Transport Minister Kamel Al-Wazir, Fayoum Governor Mohamed Hany and Beni Suef Governor Abdallah Abdel Aziz.
The station, at Demo in Fayoum governorate, will serve both governorates. It pushes the network’s 2nd line, which runs about 1,148 km from 6th of October City towards Upper Egypt, with a style speed of about 250 km/h. The line will get in touch with the very first line at Hadayek October station and with the 3rd line at Qena.
Discover more from PMN S.P.O.R.T.S - A PRIME MEDIA NETWORK BRAND
Subscribe to get the latest posts sent to your email.





