Hungary to make trains much faster on key railway route – major upgrade coming in 2027

Hungary will start remodeling 21 kilometres of the train line in between Pécs and Nagykanizsa next year, Transport and Investment Minister Dávid Vitézy has actually revealed. The task intends to enable trains to take a trip at speeds of approximately 100 km/h on areas where they presently deal with limitations of simply 40– 60 km/h due to bad track conditions.

The line is likewise utilized by Pannónia InterRégió services running in between Pécs, Nagykanizsa and Szombathely. According to Vitézy, the very first stage of the restoration might cut journey times by around 5 minutes, with additional enhancements prepared for 2028.

2 areas of the train line to be refurbished

In a Facebook postthe minister detailed 2 areas set up for restoration:

  • Gyékényes– Berzence: 15.5 kilometres
  • Középrigóc– Darány: 5.6 kilometres

The works will consist of setting up brand-new constant bonded rails, changing great deals of concrete sleepers and enhancing the track ballast. The train development will likewise be strengthened, with repair work to the underlying structure where needed.

MÁV will in addition rebuild 9 level crossings, enhance drain ditches and perform repair work and waterproofing deal with 3 train bridges.

The building tender is anticipated to be released today, permitting the real works to start in 2027.

Additional journey time cost savings anticipated from 2028

The brand-new tracks will be technically appropriate for speeds of approximately 100 km/h. Increasing the allowed speed will likewise need upgrades to train signalling and security systems.

According to Vitézy, preparation and allowing will quickly start for the required advancements on the Szentlőrinc– Szigetvár and Gyékényes– Berzence areas. These will consist of modernising light signals at level crossings and setting up devices to avoid trains from taking a trip towards each other on the very same track.

The speed boost is prepared for 2028 and might conserve Pécs– Nagykanizsa– Szombathely InterRégió guests an extra 4 to 5 minutes.

The minister likewise connected the financial investment to an organized boost in MÁV’s advancement spending plan. Hungary’s 2027 spending plan raises the train business’s financial investment allotment from HUF 30 billion to HUF 80 billion, supplying financing for tasks such as this restoration.

If you missed it: Direct Budapest-Japan flights on the horizon? Transportation minister holds conversation with airline companies


Discover more from PMN S.P.O.R.T.S - A PRIME MEDIA NETWORK BRAND

Subscribe to get the latest posts sent to your email.

Related Articles

LEAVE A REPLY

Please enter your comment!
Please enter your name here

Captcha verification failed!
CAPTCHA user score failed. Please contact us!

spot_imgspot_imgspot_imgspot_img